Taastrup

HØJE-TAASTRUP MUNICIPALITY

Høje-Taastrup Recycling Center

Høje-Taastrup recycling station is a reliable and modern recycling center, installed in just 8 days.

Høje-Taastrup Municipality renovated the site in collaboration with Vestforbrændingen, as the recycling station no longer met today’s standards. Therefore, the goal was to update the site to make it more user-friendly, improve traffic flow, and provide better facilities.

It was important for the municipality that the site had improved traffic flow, with better layout and easier access to all waste fractions. In practical terms, this meant that the garden waste area was expanded, and a new elevated platform as well as a new modular building for hazardous waste were installed – both provided by Modulo Systems.

Taastrup Taastrup Taastrup Taastrup

Høje-Taastrup Recycling Center
Lervangen 1
2630 Taastrup
Denmark

Filter by

STATEMENT

Høje Taastrup recycling center needed an upgrade as citizens had to use stairs to dispose of waste in many of the fractions. Modulo Systems had the solution where citizens drive onto the modules, making it easy to dispose of waste due to the difference in levels.

Modulo Systems understood our needs and wishes, which is why we chose a solution from Modulo Systems. The entire process, from the design phase to the installation phase, has met our expectations.

— Kenneth Bøg, Vestforbrændingen

Workshop

Høje-Taastrup recycling station has been designed in close collaboration with the employees at Vestforbrændingen and Modulo Systems’ advisors.

Modulo Systems’ unique workshop involves employees from all parts of the organization, ensuring that everyone feels a sense of ownership in the design and layout of the recycling station of the future.

Rådgivning
Taastrup

Installation

Modulo Systems has delivered an elevated solution with space for 18 containers and a modular building for the storage of hazardous waste.

The construction work began with replacing the old paving with new paving stones and asphalting a new, larger area for garden waste. Additionally, excavation was carried out for a new sewage system, and the lighting in the area was upgraded.

The elevated platform from Modulo Systems was installed on top of the new paving, providing space for 18 containers. A new modular building for hazardous waste was also installed.

Fences

Security fences have been installed on the ramp modules and outside the container bays. At the container bays, posts have been installed for mounting chains if a container is not in place. Additionally, fender strips have been mounted on the side wall, and on the end wall, a fender strip is covered with two rubber fenders.

The height of the modules is 1.2 meters, with an up and down ramp. The level difference in the area has been utilized on one side of the elevated platform, providing a height of 1.80 meters from the pavement to the top edge of the modules.

Taastrup
Taastrup

Storage of hazardous waste

Modulo Systems has also delivered a modular solution for hazardous waste.

The solution consists of 6 modules, providing a floor area of approximately 70 m². The building has two doors and four windows. In the base of the floor, collection trays with attached grating have been installed. The solution is equipped with mechanical ventilation, including point extraction from the waste fractions, and spark-proof lighting has also been installed.